DISCLAIMER - NIKZAFRI.BLOGSPOT.COM

Prospects of consultancy or site visits - email me : nikzafri@gmail.com (All contacts and interaction shall be monitored). This blog also monitors IP/Mac Address including spoofed ones or protected by VPN



The information comprised in this section is not, nor is it held out to be, a solicitation of any person to take any form of investment decision. The content of the nikzafri.blogspot.com does not constitute advice or a recommendation by the author and should not be relied upon in making (or refraining from making) any decision relating to investments or any other matter. You should consult your own independent financial adviser and obtain professional advice before exercising any investment decisions or choices based on information featured in this.

The author of nikzafri.blogspot.com can not be held liable or responsible in any way for any opinions, suggestions, recommendations or comments made by any of the contributors to the various columns on nikzafri.blogspot.com nor do opinions of contributors necessarily reflect those of http://www. nikzafri.blogspot.com


In no event shall the author be liable for any damages whatsoever, including, without limitation, direct, special, indirect, consequential, or incidental damages, or damages for lost profits, loss of revenue, or loss of use, arising out of or related to the nikzafri.blogspot.com or the information contained in it, whether such damages arise in contract, negligence, tort, under statute, in equity, at law or otherwise.

HOW ALL CASE STUDIES AND ARTICLES ARE PRODUCED

Please note that the case studies and articles I share on topics relating to civil, structural, mechanical and electrical engineering, construction, economics, manufacturing, artificial intelligence, semiconductors, ESG, standards, codes of practice, and other related disciplines are not produced in isolation.

QHSEL Consultancy Sdn. Bhd. is supported by an advisory panel and an extensive network of trusted friends, industry practitioners, professional associations/bodies and subject matter experts who willingly contribute their knowledge, insights, and professional experiences.

This collective includes Professional Engineers with Practising Certificates (PEPC), licensed brokers, economists, academicians, competent persons, auditors, risk assessors, contractors, consultants, clients, enforcement officers, active and former intelligence operatives, IT and cybersecurity specialists, AI practitioners, VR/AR/MR professionals, architects, bankers, Syariah experts, and specialists from various other fields.

As such, this is far from a one-man effort. Behind every article is a panel of experienced professionals who provide guidance, technical input, peer review, and practical perspectives drawn from real-world experience.

Many of these contributors prefer to remain anonymous to protect the confidentiality of projects, organisations, and sensitive information entrusted to them. Their motivation is not recognition, but rather to contribute towards a greater purpose: promoting sound practices, strengthening governance, enhancing compliance, improving industry standards, and reducing deficiencies, non-conformances, and avoidable failures across various sectors.

The views presented are therefore often the result of multidisciplinary collaboration, professional discourse, and collective expertise rather than the opinion of a single individual.



MY EMPLOYERS AND CLIENTELLES




A THOUGHT

I identify myself as a Lifelong Learner and a Thought Leader

BIODATA - NIK ZAFRI



 



NIK ZAFRI BIN ABDUL MAJID,
CONSULTANT/TRAINER
Email: nikzafri@yahoo.com, nikzafri@gmail.com
https://nikzafri.wixstudio.com/nikzafriv2

Kelantanese, Alumni of Sultan Ismail College Kelantan (SICA), Business Management/Administration, IT Competency Cert, Certified Written English Professional US. Has participated in many seminars/conferences (local/ international) in the capacity of trainer/lecturer and participant.

Affiliations :- Council/Network Member of Gerson Lehrman Group, Institute of Quality Malaysia, Auditor ISO 9000 IRCAUK, Auditor OHSMS (SIRIM and STS) /EMS ISO 14000 and Construction Quality Assessment System CONQUAS, CIDB (Now BCA) Singapore), TE (ABAC UK)

* Possesses almost 30 years of experience/hands-on in the multi-modern management & technical disciplines (systems & methodologies) such as Knowledge Management (Hi-Impact Management/ICT Solutions), Quality (TQM/ISO), Safety Health Environment, Civil & Building (Construction), Manufacturing, Motivation & Team Building, HR, Marketing/Branding, Business Process Reengineering, Economy/Stock Market, Contracts/Project Management, Finance & Banking, etc. He was employed to international bluechips involving in national/international megaprojects such as Balfour Beatty Construction/Knight Piesold & Partners UK, MMI Insurance Group Australia, Hazama Corporation (Hazamagumi) Japan (with Mitsubishi Corporation, JA Jones US, MMCE and Ho-Hup) and Sunway Construction Berhad (The Sunway Group of Companies). Among major projects undertaken : Pergau Hydro Electric Project, KLCC Petronas Twin Towers, LRT Tunnelling, KLIA, Petronas Refineries Melaka, Putrajaya Government Complex, Sistem Lingkaran Lebuhraya Kajang (SILK), Mex Highway, KLIA1, KLIA2 etc. Once serviced SMPD Management Consultants as Associate Consultant cum Lecturer for Diploma in Management, Institute of Supervisory Management UK/SMPD JV. Currently – Associate/Visiting Consultants/Facilitators, Advisors/Technical Experts for leading consulting firms (local and international), certification bodies including project management. To name a few – Noma SWO Consult, Amiosh Resources, Timur West Consultant Sdn. Bhd., TIJ Consultants Group (Malaysia and Singapore), QHSEL Consultancy Sdn. Bhd.

He is also currently holding the Position of Principal Consultant/Executive Director (Special Projects) - Systems and Methods, ESG, QHSE at QHSEL Consultancy Sdn. Bhd.* Ex-Resident Weekly Columnist of Utusan Malaysia (1995-1998) and have produced more than 100 articles related to ISO-9000– Management System and Documentation Models, TQM Strategic Management, Occupational Safety and Health (now OHSAS 18000) and Environmental Management Systems ISO 14000. His write-ups/experience has assisted many students/researchers alike in module developments based on competency or academics and completion of many theses. Once commended by the then Chief Secretary to the Government of Malaysia for his diligence in promoting and training the civil services (government sector) based on “Total Quality Management and Quality Management System ISO-9000 in Malaysian Civil Service – Paradigm Shift Scalar for Assessment System”

Among Nik Zafri’s clients : Adabi Consumer Industries Sdn. Bhd, (MRP II, Accounts/Credit Control) The HQ of Royal Customs and Excise Malaysia (ISO 9000), Veterinary Services Dept. Negeri Sembilan (ISO 9000), The Institution of Engineers Malaysia (Aspects of Project Management – KLCC construction), Corporate HQ of RHB (Peter Drucker's MBO/KRA), NEC Semiconductor - Klang Selangor (Productivity Management), Prime Minister’s Department Malaysia (ISO 9000), State Secretarial Office Negeri Sembilan (ISO 9000), Hidrological Department KL (ISO 9000), Asahi Kluang Johor(System Audit, Management/Supervisory Development), Tunku Mahmood (2) Primary School Kluang Johor (ISO 9000), Consortium PANZANA (HSSE 3rd Party Audit), Lecturer for Information Technology Training Centre (ITTC) – Authorised Training Center (ATC) – University of Technology Malaysia (UTM) Kluang Branch Johor, Kluang General Hospital Johor (Management/Supervision Development, Office Technology/Administration, ISO 9000 & Construction Management), Kahang Timur Secondary School Johor (ISO 9000), Sultan Abdul Jalil Secondary School Kluang Johor (Islamic Motivation and Team Building), Guocera Tiles Industries Kluang Johor (EMS ISO 14000), MNE Construction (M) Sdn. Bhd. Kota Tinggi Johor (ISO 9000 – Construction), UITM Shah Alam Selangor (Knowledge Management/Knowledge Based Economy /TQM), Telesystem Electronics/Digico Cable(ODM/OEM for Astro – ISO 9000), Sungai Long Industries Sdn. Bhd. (Bina Puri Group) - ISO 9000 Construction), Secura Security Printing Sdn. Bhd,(ISO 9000 – Security Printing) ROTOL AMS Bumi Sdn. Bhd & ROTOL Architectural Services Sdn. Bhd. (ROTOL Group) – ISO 9000 –Architecture, Bond M & E (KL) Sdn. Bhd. (ISO 9000 – Construction/M & E), Skyline Telco (M) Sdn. Bhd. (Knowledge Management),Technochase Sdn. Bhd JB (ISO 9000 – Construction), Institut Kefahaman Islam Malaysia (IKIM – ISO 9000 & Internal Audit Refresher), Shinryo/Steamline Consortium (Petronas/OGP Power Co-Generation Plant Melaka – Construction Management and Safety, Health, Environment), Hospital Universiti Kebangsaan Malaysia (Negotiation Skills), Association for Retired Intelligence Operatives of Malaysia (Cyber Security – Arpa/NSFUsenet, Cobit, Till, ISO/IEC ISMS 27000 for Law/Enforcement/Military), T.Yamaichi Corp. (M) Sdn. Bhd. (EMS ISO 14000) LSB Manufacturing Solutions Sdn. Bhd., (Lean Scoreboard (including a full development of System-Software-Application - MSC Malaysia & Six Sigma) PJZ Marine Services Sdn. Bhd., (Safety Management Systems and Internal Audit based on International Marine Organization Standards) UNITAR/UNTEC (Degree in Accountacy – Career Path/Roadmap) Cobrain Holdings Sdn. Bhd.(Managing Construction Safety & Health), Speaker for International Finance & Management Strategy (Closed Conference), Pembinaan Jaya Zira Sdn. Bhd. (ISO 9001:2008-Internal Audit for Construction Industry & Overview of version 2015), Straits Consulting Engineers Sdn. Bhd. (Full Integrated Management System – ISO 9000, OHSAS 18000 (ISO 45000) and EMS ISO 14000 for Civil/Structural/Geotechnical Consulting), Malaysia Management & Science University (MSU – (Managing Business in an Organization), Innoseven Sdn. Bhd. (KVMRT Line 1 MSPR8 – Awareness and Internal Audit (Construction), ISO 9001:2008 and 2015 overview for the Construction Industry), Kemakmuran Sdn. Bhd. (KVMRT Line 1 - Signages/Wayfinding - Project Quality Plan and Construction Method Statement ), Lembaga Tabung Haji - Flood ERP, WNA Consultants - DID/JPS -Flood Risk Assessment and Management Plan - Prelim, Conceptual Design, Interim and Final Report etc., Tunnel Fire Safety - Fire Risk Assessment Report - Design Fire Scenario), Safety, Health and Environmental Management Plans leading construction/property companies/corporations in Malaysia, Timur West Consultant : Business Methodology and System, Information Security Management Systems (ISMS) ISO/IEC 27001:2013 for Majlis Bandaraya Petaling Jaya ISMS/Audit/Risk/ITP Technical Team, MPDT Capital Berhad - ISO 9001: 2015 - Consultancy, Construction, Project Rehabilitation, Desalination (first one in Malaysia to receive certification on trades such as Reverse Osmosis Seawater Desalination and Project Recovery/Rehabilitation), ABAC Centre of Excellence UK (ABMS ISO 37001) Joint Assessment (Technical Expert)

He is also rediscovering long time passions in Artificial Intelligence, ICT and National Security, Urban Intelligence/Smart Cities, Environmental Social and Governance, Solar Energy, Data Centers - BESS, Tiers etc. and how these are being applied.

* Has appeared for 10 consecutive series in “Good Morning Malaysia RTM TV1’ Corporate Talk Segment discussing on ISO 9000/14000 in various industries. For ICT, his inputs garnered from his expertise have successfully led to development of work-process e-enabling systems in the environments of intranet, portal and interactive web design especially for the construction and manufacturing. Some of the end products have won various competitions of innovativeness, quality, continual-improvements and construction industry award at national level. He has also in advisory capacity – involved in development and moderation of websites, portals and e-profiles for mainly corporate and private sectors, public figures etc. He is also one of the recipients for MOSTE Innovation for RFID use in Electronic Toll Collection in Malaysia.

Note :


TO SEE ALL ARTICLES

ON THE"LABEL" SECTION BELOW (RIGHT SIDE COLUMN), YOU CAN CLICK ON ANY TAG - TO READ ALL ARTICLES ACCORDING TO ITS CATEGORY (E.G. LABEL : CONSTRUCTION) OR GO TO THE VERY END OF THIS BLOG AND CLICK "Older Posts"

Showing posts with label CONQUAS. Show all posts
Showing posts with label CONQUAS. Show all posts

Tuesday, November 10, 2026

Construction Defects After Handover: Responsibility, Risk and Integrity


Based on my experience in construction and consultancy, handover is often where a different set of challenges begins. The building enters everyday use, systems operate under actual conditions, and defects that were previously unnoticed become apparent.

Water ingress, debonded tiles, drainage problems and recurring cracks can quickly lead to disagreements over responsibility, cost and the adequacy of repairs.

I think this stage deserves as much attention as construction itself. It tests the quality of the work, the effectiveness of contract administration and the willingness of everyone involved to resolve problems fairly.

1.0 UNDERSTANDING CPC, DLP, CMGD AND CCC

The Certificate of Practical Completion (CPC) generally marks practical completion under the construction contract. Under many conventional arrangements, it starts the Defects Liability Period (DLP) and triggers specified consequences concerning possession and retention.

The DLP provides a contractual mechanism for reporting and rectifying defects for which the contractor is responsible. Its duration and procedures depend on the contract.

The Certificate of Making Good Defects (CMGD) confirms that the applicable contractual requirements for making good defects have been satisfied. Under PAM arrangements, it is linked to release of the remaining retention and the process towards final certification. DLP expiry alone does not establish that rectification is complete.

The Certificate of Completion and Compliance (CCC) serves a statutory purpose. It replaced the earlier Certificate of Fitness for Occupation, commonly called CF or CFO, for projects covered by the system introduced in April 2007. Unlike the former local authority certification system, CCC is issued by the authorised Principal Submitting Person (PSP).

These certificates address different responsibilities. They should not be treated as interchangeable.

2.0 IS THE CONSULTANT OUT OF THE PICTURE?

A common assumption is that the consultant’s involvement ends at handover. Generally, under conventional arrangements, that is incorrect.

Site attendance may reduce, but the appointed architect or contract administrator may still have duties involving defects inspections, instructions, assessment of rectification and certification. Engineers and other consultants contribute within their respective appointments.

Under PAM 2018, for example, the architect has a defined role in responding to the contractor’s notification that defects have been made good, either issuing CMGD or stating reasons for non-issuance.

I feel that uncertainty over these continuing roles can itself become a project risk. Before the site team disperses, the client should establish who receives complaints, who investigates, who instructs repairs and who verifies closure.

If a consultant’s appointment has ended, the remaining functions need an appropriately authorised arrangement. The consultant’s appointment, statutory role as PSP and potential responsibility for earlier professional services are separate matters.

3.0 INVESTIGATE THE CAUSE BEFORE ALLOCATING RESPONSIBILITY

A complaint identifies a symptom, BUT it does not necessarily establish who is responsible.

A leaking ceiling could arise from waterproofing workmanship, an unsuitable design detail, a pipe connection, subsequent alterations or inadequate maintenance.

PAM’s guidance emphasises investigating the category and root cause of defective work before attributing responsibility, including distinguishing workmanship, design and misuse.

Based on my experience, a repair can appear satisfactory during inspection yet fail again under rain, operating loads or normal occupancy. Verification should therefore reflect the conditions that caused the failure.

Repainting a damp wall, for example, should not close a water-ingress complaint unless the source has been addressed and the repair appropriately verified.

4.0 THE COMMERCIAL IMPACT ON BOTH PARTIES

For the client, unresolved defects can disrupt operations, damage property, increase maintenance costs and affect occupants’ confidence. Poor records also make responsibility and recovery of costs harder to establish.

For the contractor, repeated mobilisation, subcontractor attendance, unavailable replacement materials and repairs within occupied premises create additional costs. Delayed CMGD can prolong account closure and delay release of remaining retention.

Fair administration protects both parties. Premature certification may weaken the client’s practical protection, while withholding certification or money without proper contractual grounds can expose the client to disputes.

Where the contractor fails to rectify defects for which it is responsible, the contract may allow others to undertake the repairs and appropriate costs to be recovered. The prescribed notices and procedures remain important.

5.0 RISK ASSESSMENT : PRIORITISING THE RIGHT DEFECTS

I think defects should be prioritised by their consequences and likelihood of further harm, rather than simply by the order in which complaints arrive.

A practical assessment should consider:

  • Safety and health consequences.
  • Effects on essential services and building operations.
  • Likelihood of recurrence or deterioration.
  • Potential damage to adjoining areas or property.
  • Risks created by the rectification work itself.

This approach is consistent with the risk management principles in ISO 31000:2018, which provides guidelines rather than a certifiable management system standard.

For example, a suspected loose façade component requires a different response from a minor paint blemish. Temporary protection, isolation or specialist assessment may be necessary before permanent repairs.

Repairs in occupied buildings also need suitable task risk assessments and, where applicable, elements of CONQUAS/QLASSIC should be considered and perhaps HIRARC, access controls and coordination with building management.

6.0 ABMS : INTEGRITY DURING DEFECTS CLOSURE

The defects stage also creates opportunities for improper influence: pressure to overlook incomplete repairs, inducements linked to certification, undisclosed interests in replacement contractors or unjustified deductions.

An Anti-Bribery Management System (ABMS) based on ISO 37001:2025 provides a framework for preventing, detecting and responding to bribery.

Applied to defects management, useful controls include declarations of conflicts of interest, appropriate due diligence on rectification contractors, transparent approval of repair costs, independent verification where warranted and accessible reporting channels.

I feel that integrity is particularly important when financial pressure meets technical judgement. Certification should be supported by evidence and the applicable requirements. ABMS controls support that discipline; they do not replace engineering assessment or contractual procedures.

A disputed defect or delayed certificate does not, by itself, establish bribery. Concerns require evidence and fair investigation.

7.0 CODES OF PRACTICES AND STANDARDS : ESTABLISHING ACCEPTANCE CRITERIA

Defect assessment should refer to the approved drawings, specifications, contractual requirements, applicable legislation, relevant Malaysian Standards and codes of practice, and manufacturers’ installation requirements.

Acceptance criteria should be identified before repairs begin, including any necessary testing.

CIDB’s CIS 7:2021, used for QLASSIC, provides a framework for assessing workmanship quality. However, its application to a particular defects dispute must be considered against the contract and the assessment’s intended purpose. A QLASSIC score should not be treated as conclusive proof that every element is defect-free.

Standards should be applied within their proper scope, using the edition required by the contract or applicable regulatory requirements.

8.0 HOW DO DEFECTS AFFECT CCC

This is an important distinction. 

Based on my experience, some clients suggest that outstanding defects could invalidate the CCC (very funny), sometimes using this as leverage against the contractor. Such statements require care: outstanding defects do not, by themselves, invalidate CCC, although defects affecting safety or statutory compliance warrant prompt investigation and appropriate action.

Jabatan Kerajaan Tempatan (JKT) distinguishes between non-critical defects that can be repaired during DLP and critical defects affecting safety or health that should prevent CCC issuance.

Minor finishing defects can usually proceed through the contractual defects process. Suspected structural instability, unsafe electrical installations or failed fire-safety provisions require prompt assessment and appropriate protective action.

An existing CCC should never be used to dismiss evidence of a dangerous condition.

JKT’s published FAQ states that an issued CCC cannot simply be withdrawn administratively. However, improper issuance, false certification or non-compliance can lead to enforcement or professional disciplinary action, while disputed validity may be referred to court.

9.0 MEANINGFUL CLOSURE REQUIRE EVIDENCE

DLP expiry and CMGD do not necessarily extinguish every subsequent liability. Latent-defect claims may remain possible, depending on the facts, contract, applicable law and limitation periods.

For housing projects, the developer’s obligations to purchasers also need separate consideration from its arrangements with the main contractor. Closing the contractor’s defects account does not automatically settle purchasers’ rights.

In my view, meaningful closure requires a clear record of the defect, its cause, responsibility, repair method and verification results. Repeated failures should prompt further investigation.

The objective is to restore the required performance of the work and give all parties a defensible basis for closure. That is where technical competence, risk awareness and professional integrity come together.

Sunday, August 10, 2025

CONQUAS 21 BCA SINGAPORE (1998) - 2017 - 2022

 Seeing a photo of an ID friend carrying out an inspection brought back memories of my own experience with CONQUAS 21 from BCA Singapore, a course I attended back in 2001 while serving in Sunway, where I was assigned to projects ranging from apartments and hotels to condominiums and much more. The last time I applied it was in 2019, just before the MCO, when a client requested it. I adjusted my scoring moderately, taking into account Malaysian conditions.


On that occasion, I was joined by two QLASSIC inspectors sent to observe. When they heard me mention CONQUAS 21, their reaction was, “Wow, this guy is a veteran.” One of them asked, “So, how many stars?” I replied, "in Singapore’s 5-Star standard, even hairline cracks, slight paint peeling, uneven coating, or small beam bulges can cause significant point deductions. If such defects are found repeatedly across multiple inspection points, they may be treated as ‘major’ and could result in failing that section. (With the stricter requirements in the 9th Edition (2017) and the 2022 version, achieving top scores has become noticeably tougher) Suddenly, both inspectors went silent.

Wednesday, February 28, 2024

JANGAN CURI SISTEM ORANG LAIN

 25 Julai, 2016

Saya bertemu seorang bakal klien yang meminta saya memberikan sebutharga membangunkan dan menaiktaraf sistem dan dokumentasi yang ada sekarang konsisten dengan piawaian versi terkini.

Semasa saya melakukan penilaian jurang, saya dapati perkataan, cartalir, senarai semak, borang dll yang terdapat dalam prosedur, manual, pelan adalah sangat mirip kepada apa yang pernah saya bangunkan pada akhir 90-an. Apabila saya merujuk kepada sistem sokongan yang masih saya simpan, memanglah ianya 'sebiji' macam 'saya punya'.

Memang saya amat mengenali kerja saya dan hasil tangan saya. Apatah lagi terdapat "satu tanda" yang sengaja saya 'embed' kan dan tidak dapat dilihat dengan mata pada sesetengah dokumentasi dan rekod. Nampaknya perunding terdahulu tidak langsung memindanya dan sekadar 'copy & paste'. 

Saya membuat penyelidikan sendiri dan mendapati orang yang dipanggil "perunding" oleh klien saya adalah bekas rakan sekerja saya. Mungkin dia telah 'mencuri' format-format saya. Malangnya format itu adalah format 'purba' yang saya tidak gunakan lagi tetapi saya masih mengenali format/templat saya.

Saya memberitahu klien saya mengenai perkara itu. Dia memberitahu saya beberapa perkara yang mengejutkan saya :

a. Si-anu tu selalu sebut nama Encik Nik - dia kata dia kenal dan kononnya Encik Nik lah yang mengajar dia. (dia 'jual nama' saya) Silap saya juga kerana percayakan dia ada menunjukkan "masters" (MBA) dsb.

b. Bila saya (klien) mendapati "sistemnya" kucar-kacir, saya hairan bila mendapat komen-komen yang sangat berat daripada badan persijilan. Lalu saya menamatkan perkhidmatannya dan teringat pula dia ada sebut nama Encik Nik. 

Sekarang tembelangnya dah pecah.

Saya menjawab :

a. Memang saya mengenali dia, tetapi dia bukan dalam bidang saya, saya pun tidak sangka dia akan mengambil format-format lama saya, memang banyak kesalahan dalam format tu. Itulah akibatnya bila tidak merujuk kepada saya, kalaulah dia meminta izin, sudah tentu saya akan menunjukajar padanya dan akan memberikan format yang betul.

Tidak perlu ada "masters" pun nak bangunkan dokumentasi. Cuma perlukan pengalaman yang mencukupi dalam membangunkan sistem dokumentasi dan memahami pelbagai industri.

b. Dia telah mengambil dokumentasi sektor pembinaan yang langsung tidak sama dengan sektor perkapalan/'oil & gas exploration'. Sudahlah format yang lama - salah pula industrinya.

Ramai yang beranggapan bidang saya ini bidang mudah "kerja menaip sahaja". Ini adalah salah satu contoh dari ratusan contoh sistem pengurusan yang gagal kerana dokumentasinya tidak betul.

Saya terpaksa membaiki keseluruhan struktur sistem dokumentasi berkenaan.

Pengajarannya : Jangan curi ilmu, ianya tidak berkat. Duit yang diperolehi pun tidak bersih. Lebih baik ambil masa belajar bersungguh-sungguh. Tidak ada jalan pintas jika mahu berjaya.


Saturday, October 24, 2015

THE NEW ISO 9001:2015 - NIK ZAFRI

WHAT TO EXPECT IN THE NEW ISO 9001:2015 (PART 1)

Disclaimer : Most of the contents here are not the 'actual/literal' text of the actual new ISO 9001:2015. It's the personal interpretation of the author.

0.1 – QMS as a strategic decision, a robust Quality Management Systems (QMS) – to help organization to improve its overall performance and forms an integral component of sustainable development. Design and implementation of QMS is influenced by the context of organization and   (including) the changes.

Definition

a. Strategic– Identification of long term/overall aims and interest and means to achieve them (taking into account coping up with fundamental changes – susceptible to the surroundings (what is happening around you) – law, competition, regulations, standards, trends, new technology, innovation, Research and Development etc.)

b. Robust– a process, system able to withstand or overcome adverse conditions (defects, non-conformance, corrective action request)

c. Improve overall performance – integral component of sustainable development– no system is perfect, it should be improved and become part and parcel of company's culture to achieving excellence.

d. Designed and Implemented by the sort of industry-specific – service/product provided by the company (to achieve such purpose – goals and objectives) – customization/tailor-made (1)

The rest of the content in 0.1 also talks about culture (already covered), external factors – socio-economic conditions under which it operates) – when we talk about socio-economic conditions – it talks about how the process - impacts the general public, public perception, surroundings  – possibly employment opportunity and most important – the organization must realize its financial capacity –not to do something way beyond their ability. Do something that suits the organization ONLY  (2)

Also touched on QMS can differ from one organization to another(See (1) - customization)

0.2 – not much have been changed except more emphasis is given in point no. 2 – ISO 9001 – improved internal communication, better understanding and control of process – reduction in defects and waste 

(the only way to do all these is to adopt principle of “no walls, no politics, no overlapping of duties, no pinpointing, no blaming culture” - so 100 points go to"Improved Internal Communication"  - everything starts here....

and also point no. 4 of 0.2 – ISO 9004 which touches on configuration management; apart from other elements – quality plan, project QM, measurement process/equipment, documentation, (and again - ) financial/economic benefits of the system (See (2), Statistics etc.

Definition

Configuration Management - system engineering process for establishing and maintaining consistency of a product's (or services) performance, functional and physical attributes with its requirements, design and operational information throughout its life.

0.3– comprehensive process-approach explained in better details. What's interesting are the words “understood” and “understanding” are being used. It means that the system HAS to be understood – on company-wide basis.

There is no point making a system only to be understood by a certain 'exclusive top management level'.

How to make everyone understand?

Mind you, I'm not talking about the typical 
(word by word) memorizing the policy or objectives – remember UNDERSTAND is totally different than MEMORIZE....

- a laymen understanding – is to understand QMS in their OWN work! (refer Job Description and Responsibilities/Authorities) – if these are not clear, DON'T HOPE everyone to understand – you will receive typical provoking comments from them just like when the previous system was implemented - “This is not my job?” “Having ISO is like having NOTHING – no impact – nothing for me” - hence - they don't feel the system!

0.4 including Figure 1 and 2 talk about 'Plan-Do-Check-Act” in much more simple understanding but implementable.


0.5 Something new – Risk-Based Thinking (in fact it's partial risk management) – which I agree 100%.

Definition

Simply look back at your Management Review Meeting, Data Analysis and Continual Improvement Plan (if you have any - if you don't, then 'BIG TROUBLE') – now PROACTIVELY start identifying, assess and prioritize the risks (the effect of "uncertainty") – how do you that? 

Yes, look back at frequent problems in your data? 

And prioritize - put them according to order, mark them with RED, YELLOW or GREEN and discuss the solution further. You can also integrate ITP, HIRARC, SHASSIC, CONQUAS or whatever specific assessment/inspection system you have (if you have one - if you don't, then go for the normal inspection that you do - incoming, in-process and outgoing) etc. into it. 

No overlapping please...let all the system be harmonized and co-exist.

Now, should you have a full (projected) Risk Management Plan before starting the operation? (Preliminary, Design, Interim and Final) – if you have the time – the answer is YES!


Project Management - Critical Path Method - justify the RED ones by thinking outside the box (outside the software) - there must be alternative ways of justifying it. Yes, I have the great CPM and the 'technical S Curve'  but why is there still delay?

Just match it with your MRM Data...you'll be on the right track.

0.6– compatibility with other management systems – explained in greater details.

VERDICT?

Yes, the new ISO 9001:2015 is attempting to cover and solve ALL kinds of management and technical problems (sound kind of ambitious - don't you think?) – however, lots of cross-referencing need to be made. Act smart for a while...please

(wait for Part 2)

Sunday, June 22, 2008

CONQUAS telah dibangunkan oleh Lembaga Pembangunan Industri Pembinaan - (CIDB) Singapura selaras dengan kehendak agensi sektor awam dan badan-badan professional untuk mengukur tahap kualiti yang dicapai bagi sesuatu projek.


Objektif CONQUAS


Untuk menyelaraskan standard penilaian kualiti bagi projek pembinaan.

Untuk menjalankan objektif penilaian kualiti dengan :-

mengukur kerja-kerja yang telah dibina berbanding dengan standard dan spesifikasi tenaga kerja (workmanship)

menggunakan pendekatan secara persampelan mengikut kesesuaian projek.

Untuk memudahkan penilaian kualiti dijalankan secara sistematik dengan kos
dan masa yang berpatutan.


CONQUAS meletakkan standard keatas aspek-aspek pembinaan pelbagai serta menganugerahkan poin/markah bagi mana-mana kerja yang memenuhi kehendak standard. Markah-markah ini akan dicampur bagi mendapatkan skor/markah kualiti secara menyeluruh yang digelar CONQUAS Score bagi projek bangunan/pembinan.


CONQUAS 21 (Edisi ke-5 CONQUAS) merangkumi kebanyakan aspek dalam kerja-kerja am bangunan. Penilaian ini terdiri daripada 3 komponen utama:


Kerja-Kerja Struktur.
Kerja-Kerja Arkitektur (termasuk kerja-kerja luaran untuk kondominium dan taman perumahan)
Kerja-Kerja Mekanikal & Elektrikal (M&E).

Setiap komponen diperincikan pula kepada sab-komponen untuk penilaian. Contohnya, Komponen Struktur biasanya mempunyai sab-komponen seperti konkrit (tetulang), dll.


Walaubagaimanapun, penilaian ini tidak memasukkan kerja-kerja yang melibatkan kenderaan/loji berat seperti piling, heavy foundation dan kerja-kerja sab-struktur


Bangunan biasanya dinilai dari segi standard workmanship yang dicapai menerusi pemeriksaan. Penilaian Struktur dan M&E dilakukan sepanjang proses pembinaan manakalah Penilaian Arkitektur dijalankan keatas bangunan yang telah siap.


Selain daripada pemeriksaan tapak, penilaian ini juga mengambilkira ujian bahan dan prestasi funsi bagi khidmat dan pemasangan. Ujian ini akan menambahkan pengetahuan, kesedaran keselamatan dan kesihatan pekerjaan dll.


Standard minima telah dihasilkan oleh perbincangan dengan sesetengah sektor , pembangunan hartanah dan kontraktor berdasarkan spesifikasi am yang terbabit dalam projek masing-masing.


Dalam membangunkan CONQUAS 21, banyak pembelajaran dan ujian telah dijalankan bagi mengemaskinikan teknik ujian dan standard penilaian. Sistem Pemarkahan yang dijalankan bersama-sama dengan ujian akan memastikan ketepatan dan keselarasan.


Disesuaikan kembali daripada : CONQUAS 21